Main Image

FEED

The next logical step in the progression for developing a field or subsea system is to move into preliminary design. This is where INTECSEA can define a system arrangement and field layout, generate design specifications for the field or subsea tie-back, develop work scopes, create bid packages, liaison between vendors and client, and provide recommendations of vendors and components necessary for a satisfactory result to the project.

Sign up to receive our quarterly newsletter A value is required.
A value is required.
A value is required.

A value is required.
Please select an item.
A value is required.Invalid format.

Invalid format.
tertiary column content here tertiary column content here tertiary column content here tertiary column content here tertiary column content here tertiary column content here tertiary column content here
WorleyParsons
EcoNomics

© 2010 INTECSEA. All rights reserved.